Afrindustria/ Gas Gap Monitor

Library / NMDPRA Factsheet - August 2026

NMDPRA Factsheet - August 2026

Page 11 of 13

Open the PDF at page 11

F. Update on Major Gas Pipeline Projects and Overall Completion Status
Note꞉
Condensates production above is the sum of volumes produced from gas processing plants 
operated by NLNG, Chevron, Greenville, First Otakikpo, Ashtavinayak, PNG, Odum Energy, 
NEDO, NEPL/Panocean, Seplat Midstream, and Anoh Gas. 
Some of these volumes are exported as separate condensate streams, while others are 
transported to crude oil terminals, comingled/blended, and exported as crude streams
1.
2.
Gas‑to‑Power
Gas to Commercial
Gas Based Industries 
 Sectoral Gas Utilization 
0.537 Bcf/day
0.590 Bcf/day
(Daily Average for August 2026)
0.633 Bcf/day
LNG exported by NLNG
Pipeline export via (WAGP)
Gas Export
105,317 M /day 
(51,683 MT/day)  
0.152 Bcf/day
(Daily Average for August 2026)
3
The Authority
Note꞉    = Progression between July and August 2026
10
14.817
1.852 MB
AKK Pipeline project completion rate now reported to include the main 
backbone pipeline and other ancillary facilities  
Note꞉