Stock
What is installed: capacity and assets.
Capacity
Installed capacity monthProcessing capacity monthAverage operating capacity month
Utilisation gap
The installed capacity minus the average operating capacity, for the same month.
| Period | Basis | Value | Formula | Inputs |
|---|---|---|---|---|
| 2025-10 | month | 13.26 bscf/d | 17.2 − 3.94 | nmdpra-2025-10-factsheet p.8 |
Facility utilisation
No figures are published.
Pipelines
There are no pipeline records at this time. The NMDPRA fact sheets do not give the route, length, design capacity or completion of a pipeline. Records from secondary sources (NNPC, NGIC, ministry releases) go in gas/data/pipelines.csv. Each record has its own citation and source_tier = secondary.