Afrindustria/ Gas Gap Monitor

Stock

What is installed: capacity and assets.

Capacity

Installed capacity monthProcessing capacity monthAverage operating capacity month
05101520Oct 25Nov 25Installed capacity: 17.2 bscf/d · October 2025 (month) · NMDPRA Fact Sheet - October 2025, p.8Processing capacity: 6.1 bscf/d · October 2025 (month) · NMDPRA Fact Sheet - October 2025, p.8Average operating capacity: 3.94 bscf/d · October 2025 (month) · NMDPRA Fact Sheet - October 2025, p.8
Gas processing, conditioning, installed and operating capacity, bscf/d. Put the pointer on a point, or touch it, to see its document and page. Source: NMDPRA, NMDPRA Fact Sheet - October 2025.

Utilisation gap

The installed capacity minus the average operating capacity, for the same month.

PeriodBasisValueFormulaInputs
2025-10month13.26 bscf/d17.2 − 3.94nmdpra-2025-10-factsheet p.8

Facility utilisation

No figures are published.

Pipelines

There are no pipeline records at this time. The NMDPRA fact sheets do not give the route, length, design capacity or completion of a pipeline. Records from secondary sources (NNPC, NGIC, ministry releases) go in gas/data/pipelines.csv. Each record has its own citation and source_tier = secondary.