Library / Extraordinary Federal Republic of Nigeria Official Gazette No. 38
Extraordinary Federal Republic of Nigeria Official Gazette No. 38
Page 9 of 10
SCHEDULE TABLE OF FEES The transferee shall be required to pay theapplicable assignment or transfer of licence or permit processing fee in the table below, or five percent (5%) of the value of transaction, whichever is higher — S/No Facility Processing Fees I. | Petrol liquids or gas retail outlets 500.000 2 Depots N10.000.000 3: Blending Plants, Waste Recycling N3,000.000 Plants, Bitumen Emulsion Plants, Refilling Plants or Thermal Desorption Units 4. | Hydrocarbon Processing Plant USD10,000 for capacities less (Refineries, Petrochemicals and Gas than |.000BPSD. or less than Processing facilities) 6MMSCFD USD 50,000 for capacities between 1,000 and 30.000 BPSD, or between 6 MMSCFD and IS0MMSCFD USD 150,000 for capacities above 30,000 BPSD, or above 180 MMSCFD 5. | Pipeline USD 500 per km 6. | Pipeline Distribution Network USD 200 per km ds Pipeline Transportation Network USD250 per km 8 | Terminals USD200.000 9. | CNG Compression Station/Small Scale NGN 500,000 LNG Installations Mabe at Abuja this 27th day of February, 2023. ENGR. Farouk AHMED Authority Chief Executive Nigerian Midstream and Downstream Petroleum Regulatory Authority
RegulationsPDF20232023-029