Library / ENVIRONMENTAL REGULATIONS FOR MIDSTREAM AND DOWNSTREAM PETROLEUM OPERATIONS IN NIGERIA 2022 DRAFT DATE: 10/06/2022 GENERAL
ENVIRONMENTAL REGULATIONS FOR MIDSTREAM AND DOWNSTREAM PETROLEUM OPERATIONS IN NIGERIA 2022 DRAFT DATE: 10/06/2022 GENERAL
Page 2 of 17
2 ENVIRONMENTAL STUDIES Environmental Risk Register (ERR) 6. All proposed Midstream and Downstream projects shall maintain an Environmental Risk Register (ERR) to understand and collate all risks posed by the proposed project to the people and environment, and for the Authority’s approval of the project. 7. An Operator shall prepare an ERR for every development and/or upgrade modification of facilities such as: a) Establishment, Construction and/or modification of gas separation, processing, liquefaction, compression, gas to liquid, handling, and storage facilities, Floating storage & offloading (FSO) vessels. b) Establishment, Construction and/or modification of refineries c) Establishment, Construction and/or modification of product depots for the storage of refined or unrefined petroleum products, lube blending plants and retail outlets. d) Establishment, Construction and/or modification of any facility for the production of petrochemicals, gas-based fertilizer and other gas derivative plants. e) Construction and installation of midstream and downstream petroleum liquids and gas transportation pipelines, including delivery and trunk lines. f) Construction and/or Installation of Midstream and Downstream Petroleum Waste Treatment and/or Disposal Facilities, viz: Wastewater Treatment Plant, Waste treatment/recycling /re-use facilities, Engineered Landfills e.t.c. g) Remediation of polluted and contaminated sites h) Dredging activities i) Any other midstream and downstream petroleum activity/facility as may be designated by the Authority. a. An application for ERR shall be in the form prescribed by the Authority. b. Verified data for risk description and analysis used in an ERR shall be obtained from the Authority at a cost where available or sourced by the project owner under the strict supervision of the Authority using an approved scope. c. ERRs shall be valid as long as environmental monitoring and relevant statutory studies are conducted as applicable.
RegulationsPDF2