DPR GUIDELINES FOR APPROVAL TO CONSTRUCT AND 
OPERATE PETROLEUM PRODUCTS FILLING STATION
Procedure and conditions for granting approval for the construction and operation of 
Petrol Station; these guidelines are in compliance with Petroleum (Amendment decree 
no. 37 of 1977 safety rules and regulations).
1.
SUITABILITY INSPECTION
 
 
The intending Marketer should submit an application to DPR for site suitability 
inspection. The inspection shall among others issues report on the following basic 
requirements:-
(i)
Size of the proposed land site.
(ii)
The site does not lie within pipeline or PHCN high tension cable Right Of 
Way (ROW).
(iii)
The distance from the edge of the road to the nearest pump will not be less 
than 15 meters.
(iv)
Total number of petrol stations within 2km stretch of the site on both sides 
of the road will not be more than four including the one under 
consideration.
(v)
The distance between an existing station and the proposed one will not be 
less than 400 (four hundred) meters.
(vi)
The drainage from the site will not go into a stream or river.
(vii)
In some instances where site is along Federal Highway, a letter of consent 
from the Federal Highway is required.
(viii)
DPR guided/supervised EIA study of the site by DPR accredited 
consultant.
2.
APPROVAL TO CONSTRUCT
 
 
(i)
If suitability report on the above preliminary issues is favorable, the under 
listed documents shall be required for submission to DPR office for 
review without any obligation on DPR to grant ATC if any negative 
change to the suitability situation of the site occurs before the grant.