Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 102 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF GAS STORAGE AND UTILISATION FACILITIES IN NIGERIA Code: DPR Guide 0020 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 11 iv. Pipework, tanks to offset fill points, dispensers and vent pipes shall be routed and located to ensure protection from external effects or interference and allow access if required v. The stand for delivering fuels into storage tanks shall be in the open, away from the facility buildings, dispensing activities and emergency escape routes, and be large enough to allow a road tanker to be positioned wholly within it during delivery. vi. The siting of other activities which the facility may perform (e.g. parking areas, car wash facilities) shall not affect safety . vii. Electrical connections shall be made in accordance with the manufacturer's instructions and shall maintain the integrity of the explosion protection. viii. The minimum distance stated in Section 3.3 must be complied with. 3.3 Separation Distances The minimum distance for the establishment Gas Storage and Utilisation Facility are as follows: 3.3.1 LNG Regasification Separation Distances The distances given in the table below indicate the minimum approved horizontal distances between the nearest point on the storage tank and a specified feature, e.g. an adjacent storage tank, building or boundary and the dispensers. Table 3.1 Minimum Safety Distances from LNG Storage Tank to Adjoining Properties or Amenities TANK STORAGE CAPACITY (MT) AT LNG DENSITY 450kg/m3 MINIMUM DISTANCE FROM EDGE OF IMPOUNDMENT OR LNG TANK DRAINAGE SYSTEM TO PROPERTY/AMENITIES (m) MINIMUM DISTANCE BETWEEN STORAGE TANKS (m) 0.9 - 3.4 4.6 1.5 3.4 – 28.3 7.6 1.5 28.3 – 51.3 15 1.5 51.3 – 119.3 23 1.5 > 119.3 30 Note: Bund wall installations are critical for LNG facilities
OtherPDF102