Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 114 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF GAS STORAGE AND UTILISATION FACILITIES IN NIGERIA Code: DPR Guide 0020 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 23 iv. Where numerous storage vessels are used, consideration should be given to separating these into isolatable sub-groups. ESDs activating these isolation valves shall be provided both locally at each exit point from the storage site and remotely. 3.8 Fire/Blast Walls When Fire walls are used as determined in Section 3.3, the walls shall, at the minimum, be of the following features: i. imperforated and substantially constructed from concrete or solid masonry and be capable of achieving at least 30 minutes of fire resistance. Where the wall separates vulnerable populations from the dangerous substance, the fire resistance provided shall be for a minimum of 60 minutes. ii. shall not be less than the height of the vessel. For larger vessels, it should not be less than 2 meters high or the height of the vessel, whichever is greater. iii. The thickness of the Firewall shall not be less than of 0.23m (9 inch). iv. The separation distance between the vessel and the firewall shall not be less than 3 meters. v. The installation of the fire wall shall not significantly impair natural ventilation. The provision on one side is normally sufficient. However, it shall not be more than two sides. Note: The specification and composition of materials for the Firewall shall be submitted to the appropriate DPR field/zonal office and the construction shall also be monitored by the assigned DPR representatives.
OtherPDF114