Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 125 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF GAS STORAGE AND UTILISATION FACILITIES IN NIGERIA Code: DPR Guide 0020 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 34 LNG Liquefied Natural Gas LPG Liquefied Petroleum Gas LTO License to Operate MISTDO Minimum Industry Safety Training for Downstream Operators MOSR Mineral Oils (Safety) Regulation MSDS Material Safety Data Sheet MT Metric Tonnes P&ID Piping and Instrumentation Diagram PRMS Pressure Reducing and Metering Station PPE Personal Protective Equipment PVC Polyvinyl Chloride ROW Right of Way SOP Standard Operating Procedure SSA Site Suitability Approval UST Underground Storage Tanks UTM Ultrasonic Thickness Measurement Approved by Engr. Sarki Auwalu, MNSE (Director/CEO, Department of Petroleum Resources) Date 1st September 2020
OtherPDF125