Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 127 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF CNG COMPRESSION FACILITIES IN NIGERIA Code: DPR Guide 0029 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved i Table of Contents 1 INTRODUCTION ................................................................................................................ 1 1.1 Purpose ....................................................................................................................... 1 1.2 Scope .......................................................................................................................... 1 1.3 Definition of Terms .................................................................................................... 1 2 APPLICATION, APPROVAL AND LICENSE PROCEDURE FOR FACILITY ......................... 1 2.1 Application Overview ................................................................................................. 1 2.2 Site Suitability Approval ............................................................................................. 2 2.2.1 Procedure for Site Suitability Inspection ........................................................... 2 2.2.2 Validity of Site Suitability Approval: ................................................................... 3 2.3 Approval to Construct/Approval to Install ................................................................ 3 2.3.1 Review of Submitted Documents and Drawings .............................................. 4 2.3.2 Conditions for Approval to Construct/Install .................................................... 4 2.4 License to Operate (LTO) for CNG Compression Facility ......................................... 4 2.5 Procedure for Pre-License Inspection ....................................................................... 6 2.5.1 Renewal of License to Operate .......................................................................... 7 2.6 Relocation of Existing Facility .................................................................................... 7 2.7 Lease/Takeover of CNG Compression Facility .......................................................... 7 2.8 Modification of Facility .............................................................................................. 8 2.9 Decommissioning of Facility ...................................................................................... 8 3 MINIMUM DESIGN, CONSTRUCTION AND INSTALLATION REQUIREMENTS .............. 8 3.1 General Requirements ............................................................................................... 8
OtherPDF127