Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 133 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF CNG COMPRESSION FACILITIES IN NIGERIA Code: DPR Guide 0029 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 2 iii. Satisfy the requirement stipulated by the DPR and obtain the required approvals contained in the stages depicted below: a. Site Suitability Approval b. Approval to Construct (ATC)/ Approval to Install c. License to Operate Note: The company shall comply with the minimum requirements stipulated for design, construction and installation (Section 3) to secure the approvals/licenses. 2.2 Site Suitability Approval The SSA is a business enabling and advisory tool set up to eliminate possible loss of investment that may result should the site be deemed unsuitable at Approval to Construct (ATC) phase. The company shall be required to pay the applicable fees and upload the following documents required for Site Suitability Approval on the portal: i. Survey plan of the land. ii. Certificate of Incorporation and Memorandum and Article of Association of the company. iii. A sketch of the proposed site layout, showing the existing or proposed buildings on the site, adjoining properties, if any, and the relevant distances of the tank(s) to critical facilities within the premises, roadways and adjoining fence with 3rd parties. 2.2.1 Procedure for Site Suitability Inspection The applicant shall be issued Site Suitability Approval following the satisfactory review of the uploaded documents and successful outcome of site suitability inspection in line with Section 3.2. Upon receipt of the SSA, the proponent is required to display conspicuously a sign tagged ‘DPR CNG Compression Facility Approved Site (Approval number)’.
OtherPDF133