Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 137 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF CNG COMPRESSION FACILITIES IN NIGERIA Code: DPR Guide 0029 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 6 2.5 Procedure for Pre-License Inspection To issue LTO for a facility, the DPR shall conduct a Pre-license inspection, following the satisfactory review of documents submitted in the application. The inspection shall confirm the extent of compliance with these Guidelines. At a minimum, the following shall be confirmed to be in place: i. Organogram, list of competent persons and evidence of MISTDO training of the relevant staff. ii. Functional Automated/Manual leak tester. iii. Automatic Monitoring and Control Systems. iv. SOPs. v. Post Compression Temperature Regulating System. vi. Functional Fire alarm system and mounted gas detectors at designated areas (Like pump and compressor room, discharge/offloading area and piping connector at the storage vessel, etc). vii. Safety warning notices and Personnel Protective Wears for personnel. viii. Emergency shut down system in at least two locations (At the Gate and operations area). ix. Visible display of MOSR, Operating instructions, Emergency Telephone numbers of Fire Service, Police and DPR. x. Adequate fire water storage, deluge and sprinkler system in line with relevant codes and standards. xi. Muster Point designated areas earmarked in the facility. xii. Clean and hygienic toilets with steady water supply at the facility. xiii. Demarcation of facility Tank Storage areas to unauthorized persons and limiting access to operations area to only trained personnel. xiv. A perimeter fence of at least 2 metres high shall be provided around the facility.
OtherPDF137