Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 138 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF CNG COMPRESSION FACILITIES IN NIGERIA Code: DPR Guide 0029 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 7 xv. Well-stocked First Aid Box xvi. Adequate Fire Water Storage, Fire Hydrant system/control points and booster pumps 2.5.1 Renewal of License to Operate On the expiration of an existing LTO for a facility, the company shall apply through their profile on the appropriate portal, for the renewal of LTO. The company shall pay the applicable fee and upload current and valid documents used for the LTO application. DPR officers will conduct an inspection of the facility and ancillary equipment. The inspection shall confirm, at the minimum, the status and integrity of all equipment and amenities in line with relevant standards. 2.6 Relocation of Existing Facility If a company desires to relocate an existing and licensed facility to a new site, the applicant must submit the justification (reasons) for the proposed relocation of the facility. The conditions for the grant of Approval to Construct and LTO for a new Facility shall be the same for relocated Facility. 2.7 Lease/Takeover of CNG Compression Facility The company for Lease/Takeover of a Site Suitability Approval (SSA), ATC and LTO shall pay the prescribed application fee and submit the following documents. a. Duly signed Sales Agreement by both parties. b. Letter of Release. The requirements as applicable for SSA, ATC and LTO shall apply. Inspection may be carried out as part of the process.
OtherPDF138