Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 140 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF CNG COMPRESSION FACILITIES IN NIGERIA Code: DPR Guide 0029 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 9 tanks, fittings, pumps, manifolds, meters, hoses, valves, and other equipment and accessories of the facility shall be designed for efficient and safe operations in line with applicable codes and standards. The installation and commissioning of the system shall only be undertaken by competent persons and companies, in accordance with manufacturer's instructions and best practices. Written Standard Procedures shall be drawn up and used for installation and/or commissioning. Further conditions governing the establishment of a Compression Facility are as follows: i. Participation of DPR representatives in the project and mandatory witnessing of milestone construction activities such as tank burial, pressure/leak test of the tanks and tank calibrations. ii. All critical equipment and piping shall be commissioned after installation in accordance with manufacturer’s instructions. Integrity tests and other applicable tests shall be conducted companies with relevant OGISP permits and witnessed by the Department. 3.2 Facility Layout & Site Selection 3.2.1 Site Selection Criteria Any site chosen for the facility shall be sufficiently spacious to allow it to be designed to minimize the risks from CNG as applicable to any structure close to the facility and person likely to be at or near the facility. Furthermore, the site shall meet the following requirements: i. The size of the proposed land site shall be adequate and accessible from the roadside. ii. The site shall not be within, under or close to know hazards such as pipeline Right of Way (ROW), high voltage cable, railways etc. iii. The minimum horizontal distance between the shell of a pressurized tanks and the line of adjoining property that may be developed shall be as shown in Table
OtherPDF140