Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 145 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF CNG COMPRESSION FACILITIES IN NIGERIA Code: DPR Guide 0029 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 14 iv. All safety valves shall be fitted with vent pipes discharging vertically upwards at a minimum height of 2 meters above the rank top. The vent pipes shall be fitted with loose fitting rain caps. v. Every CNG storage unit including each manifold group of cylinders or bulk storage tank shall be provided with suitable pressure gauges which shall communicate directly with the tank or storage unit system and shall have an opening not to exceed 1.4 mm diameters at the connection. The pressure gauge shall have a dial graduated to read approximately double the operating pressure, but in no case less than 1.2 times the pressure at which the pressure relief valves is set to function. Pressure gauges shall be checked and calibrated at intervals not exceeding 12 months in line with MOSR 1997. vi. Methane gas leak detection device shall be provided at the CNG facilities for warning when an airborne methane gas concentration exceeds 20% of the lower explosion limit, warning shall be plainly audible and visible to those within the zone of potential exposure to fire or explosion of vessel, system or delivery operation. vii. Multiple cylinder units or groups stored in the vertical position shall be limited to a width of no more than 4 cylinders. Units or groups stored in the horizontal position shall be limited to a height of 6 cylinders at a width of 4 cylinders. When stacked horizontally, the units or groups shall be separated by not less than 1.5 meters. 3.5 Facility Connecting Pipework and Valves Piping, Valves and fittings are to be fabricated, installed, and tested inline with international standard such as ASME Process Piping Code or any other applicable codes recognised by DPR. Any exterior piping shall be buried or installed above ground and shall be supported and protected against mechanical damage. Additionally, the following shall, at a minimum, apply:
OtherPDF145