Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF CNG COMPRESSION FACILITIES IN NIGERIA Code: DPR Guide 0029 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 24 5. The appropriate Inspectors and company conducting the inspection shall be required to possess relevant certification and qualifications to carry out the inspection. 4.15 Maintenance 1. Maintenance and replacement of parts shall be carried out as and when due. 2. The maintenance which shall be carried out by qualified personnel with approved procedure, risk assessment permit to work and job safety analysis. 3. Only appropriate and approved spares shall be used. 4. Prior to any major modification of the Facility, Approval for the Modification shall be obtained from the DPR. 5. Gas Compression Facility shall train and empower their personnel to intervene and exercise a Stop Work Authority in any operation or procedure that is not considered safe. 4.16 Documentation and Record Keeping 1. Compression Facility shall be required to put in place adequate Document Control that ensure the easy retrieval and protection of records. Records of all activities pertaining to the facility should be kept on location. These documents should include: i. License to Operate. ii. Emergency procedures. iii. Security Plan. iv. Facility Response Plans. v. Operation Manual. vi. Training records. vii. Operator Training Reports viii. Copies of Inspections reports carried out. ix. Maintenance Records. x. Approved checklist for the facility.
OtherPDF155