Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 156 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF CNG COMPRESSION FACILITIES IN NIGERIA Code: DPR Guide 0029 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 25 xi. Periodic reports in line with Section 4.19 xii. SOPs xiii. Waste Management Plan xiv. Waste Consignment Note 4.17 Static Electricity in Operations: 1. The Facility must ensure that all equipment are bonded continuously or designed to eliminate the threat of discharge of static electricity. 2. During the r discharging from a truck, the Compression Facility shall ensure the grounding of the truck and secure bonding wire to the tank being filled. It shall not be removed during operations until it is confirmed that there no threat of static electricity. 4.18 Storage Tanks Management 1. Storage tanks shall be maintained in good condition to prevent loss of containment. 2. Ensure tight seal on the fill and dip point covers to prevent entry of extraneous matter. Remove all stagnant water around tank fill covers. 3. Avoid prolonged periods of low tank volume to minimize operational issues. 4. At the minimum, the tanks shall be equipped and inspected for Safety Elements, Overfill Protection, visible leaks etc. 5. The effectiveness of a cathodic and corrosion protection shall be regularly monitored and maintained in accordance with the design standards. Pad foundation or supports, tank welds shell seams, and bottom to side seams shall also be free from rust. 6. Ensure that vents are clear of debris or other plugging. 4.18.1 Internal Inspection of Storage tanks 1. The storage tanks shall be opened for internal inspection at intervals of not more than 60 calendar months in line with the MOSR, 1997 or subject to an approved Risk Based Methodology.
OtherPDF156