Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 158 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF CNG COMPRESSION FACILITIES IN NIGERIA Code: DPR Guide 0029 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 27 4.20 Reporting of Incidents 1. Compression Facility shall establish procedure for reporting, documenting, follow-up and closing near miss, incidents and accidents. 2. Whenever fire occurs at the Compression Facility or in case of serious injury or fatality in the Compression Facility, a report of the circumstances and probable cause of the fire shall be forwarded to the nearest DPR inspector or office within 24 hours and to the Director of Petroleum Resources within 48 hours of the occurrence. 5 SANCTIONS These Guidelines provide the requirements for establishing Gas Compression Facility in Nigeria and minimum requirement for operating same safely. Noncompliance with the requirements of this Guidelines shall be deemed as violations to relevant sections of the Petroleum Act 1969 as amended, Petroleum (Drilling and Production) Regulations 1969 & subsequent amendments and Mineral Oils (Safety) Regulation, 1997. These violations may summarily lead to fines to operators/facility owner or personnel and/or temporary or permanent Revocation License and/or Permit. 6 GLOSSARY Abbreviations, terms and references used in this document are explained hereunder: AGS Automated Gas System ALARP As Low As Reasonably Practicable ATC Approval to Construct CCTV Closed Circuit Television CNG Compressed Natural Gas DPR Department of Petroleum Resources EIA Environmental Impact Assessment ESD Emergency Shut Down FAT Factory Acceptance Test
OtherPDF158