Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 159 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF CNG COMPRESSION FACILITIES IN NIGERIA Code: DPR Guide 0029 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 28 HAZID Hazard Identification HAZOP Hazard and Operability HSE Health Safety and Environment LNG Liquefied Natural Gas LPG Liquefied Petroleum Gas LTO License to Operate MISTDO Minimum Industry Safety Training for Downstream Operators MOSR Mineral Oils (Safety) Regulation MSDS Material Safety Data Sheet MT Metric Tonnes P&ID Piping and Instrumentation Diagram PPE Personal Protective Equipment PVC Polyvinyl Chloride ROW Right of Way SOP Standard Operating Procedure SSA Site Suitability Approval UST Underground Storage Tanks UTM Ultrasonic Thickness Measurement Approved by Engr. Sarki Auwalu, MNSE (Director/CEO, Department of Petroleum Resources) Date 1st September 2020
OtherPDF159