Afrindustria/ Gas Gap Monitor

Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY

GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY

Page 159 of 194

Open the PDF at page 159

 
 
 
 
Applicable to all Oil & Gas Operators  
GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF CNG 
COMPRESSION FACILITIES IN NIGERIA 
Code: DPR Guide 0029 - 2020 
 
Revision  Date: 1st September 2020 
 
 
 
This is a property of the Department of Petroleum Resources. All rights reserved  
 
28 
HAZID  
Hazard Identification  
HAZOP  
Hazard and Operability   
HSE  
Health Safety and Environment  
LNG 
Liquefied Natural Gas  
LPG  
Liquefied Petroleum Gas  
LTO  
License to Operate  
MISTDO  
Minimum Industry Safety Training for Downstream Operators  
MOSR  
Mineral Oils (Safety) Regulation  
MSDS 
Material Safety Data Sheet 
MT  
Metric Tonnes   
P&ID  
Piping and Instrumentation Diagram  
PPE 
Personal Protective Equipment 
PVC 
Polyvinyl Chloride 
ROW 
Right of Way 
SOP  
Standard Operating Procedure  
SSA 
Site Suitability Approval 
UST  
Underground Storage Tanks  
UTM 
Ultrasonic Thickness Measurement 
 
 
Approved by 
 
Engr. Sarki Auwalu, MNSE 
(Director/CEO, Department of Petroleum Resources) 
 
Date 
1st September 2020