Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 16 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT OF LPG REFILLING FACILITIES AND RETAILERS’ OUTLETS IN NIGERIA Code: DPR Guide 0019 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 7 2.5.1 Renewal of LPG Refilling Facility License to Operate On the expiration of an existing operating licence, the company shall apply through the online portal for LTO. The company shall pay the applicable fee and upload relevant documents used for the LTO application. DPR officers shall conduct an inspection of the Gas Plant to confirm at the minimum, the status and integrity of all equipment and amenities in line with standards. 2.6 Lease/Takeover of LPG Refilling Facility The company for Lease/Takeover of a Site Suitability Approval (SSA), ATC and LTO shall pay the prescribed application fee and submit the following documents. i. Duly signed Sales Agreement by both parties. ii. Letter of Release. The requirements as applicable for SSA, ATC and LTO shall apply. Inspection may be carried out as part of the process. 2.7 Modification of LPG Refilling Facility The company shall apply and submit the following documents and pay the applicable fees through the online portal. i. Details of proposal for modification. ii. The As-built layout drawing of the existing facility. iii. Proposed layout sketch of the facility. iv. Detailed Piping and Instrumentation Diagram (P&ID) of the facility. v. Updated Standard Operating Procedure (SOP) consistent with this guide. vi. Manufacturers' data sheet of the storage tank(s), where applicable. Note: Facility Inspection shall apply.
OtherPDF16