Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 167 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF A GAS RETICULATION FACILITY IN NIGERIA Code: DPR Guide 0028 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 2 2 APPLICATION, APPROVAL AND LICENSE PROCEDURE FOR GAS RETICULATION FACILITIES 2.1 Application Overview Any company intending to establish a Gas Reticulation Facility in Nigeria shall: i. Apply to the Director of Petroleum Resources ii. Pay the applicable Statutory and Processing fees iii. Satisfy the requirement stipulated by the DPR and obtain the required and applicable approvals contained in the stages depicted below: a. Site Suitability Approval b. Approval to Construct (ATC)/ Approval to Install c. License to Operate Note: The company shall comply with the requirements stipulated as minimum requirements design, construction during design, construction and installation (Section 3) for the obtainment/renewal of approvals/licenses. 2.2 Site Suitability Approval (SSA) Site Suitability Approval is a business enabling and advisory instrument set up to eliminate possible loss of investment that may result should the site be deemed unsuitable at Approval to Construct (ATC) phase. The company shall be required to pay the applicable fees and upload the following documents required for Site Suitability Approval. i. Survey plan of the land ii. Certificate of Incorporation and Memorandum and Article of Association of the company. iii. A sketch of proposed site layout, showing the existing or proposed buildings on the site, adjoining properties, if any and the relevant distances of the tank(s) to critical facilities within the premises, roadways and adjoining fence with 3rd parties.
OtherPDF167