Applicable to all Oil & Gas Operators  
GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF A GAS 
RETICULATION FACILITY IN NIGERIA 
Code: DPR Guide 0028 - 2020 
 
Revision Date: 1st September 2020 
 
 
 
This is a property of the Department of Petroleum Resources. All rights reserved  
 
3 
2.2.1 
Procedure for Site Suitability Inspection 
The applicant shall be issued Site Suitability Approval following the satisfactory review of 
the uploaded documents and successful outcome of site suitability inspection in line with 
Section 3.2. Upon receipt of the SSA, the proponent is required to conspicuously display a 
sign tagged ‘DPR Gas Reticulation Approved Site (Approval number)’. 
 
2.2.2 
Validity of Site Suitability Approval: 
Site suitability approval shall be valid for 18 months in the first instance. This approval and 
any renewal thereof is subject to the following:  
i. 
No development/encroachment of Public and Residential structures that was not 
considered during the suitability approval. 
ii. 
No significant changes in the plot size capable of affecting the minimum safety 
distances for the proposed capacity. 
2.3 
Approval to Construct/Approval to Install   
Following receipt of Site Suitability Approval from the Department, the company shall 
commence actions towards obtaining Approval to Construct/Install for the proposed 
facility. The company shall pay the applicable fees, upload the required documents, and 
satisfy the following requirements: 
i. 
A letter/ approved building plan from the appropriate Town Planning Authority, 
authorizing the siting of the facility at the proposed site. The submission shall 
contain at the minimum all relevant drawings such as: 
a.  Piping and Instrumentation Diagram (P&ID)  
b. Electrical and mechanical specifications  
c. Codes, Standards and Specification adopted in the design, construction 
and installation of ancillary equipment. 
ii. 
A fire report by Chief Federal/State Fire officer or an officer authorized by him,