Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 169 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF A GAS RETICULATION FACILITY IN NIGERIA Code: DPR Guide 0028 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 4 stating satisfaction with the proposed arrangement for the prevention of fire. iii. Any of the following shall subsist - Current Tax clearance certificate, Evidence of Tax Payment, Tax Identification Number (TIN) or evidence of tax exemption. iv. Health Safety and Environment (HSE) policy for the proposed plant/Environmental Impact Assessment report of the project if above 10 MT. 2.3.1 Review of Submitted Documents and Drawings The submissions shall be reviewed in line with specifications listed in Section 3 of this document. The objective of DPR’s review is to ensure safety-in-design and sustainable operation of the Gas Reticulation Facility. Site inspection shall follow the satisfactory review of the documents and design. The site inspection shall, at the minimum, revalidate the requirements of the SSA. 2.3.2 Conditions for Approval to Construct/Install Approval to Construct shall have a validity of 30 months (in the first instance) on the following conditions: i. The facility shall commence meaningful development. The company shall update the nearest DPR office at least every six months interval. ii. Signpost shall be installed on-site immediately after the Approval to Construct is granted. The signpost should indicate the name of the company and the reference number of the Approval letter. iii. The construction and installation shall comply with the requirements stated in Section 3. iv. Companies involved in building of the facility, construction and fabrication of Storage tanks shall possess valid and appropriate DPR Oil and Gas Industry Service Permits.
OtherPDF169