GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF A GAS 
RETICULATION FACILITY IN NIGERIA 
Code: DPR Guide 0028 - 2020 
 
Revision Date: 1st September 2020 
 
 
 
This is a property of the Department of Petroleum Resources. All rights reserved  
 
4 
stating satisfaction with the proposed arrangement for the prevention of fire.  
iii. 
Any of the following shall subsist - Current Tax clearance certificate, Evidence 
of Tax Payment, Tax Identification Number (TIN) or evidence of tax exemption. 
iv. 
Health 
Safety 
and 
Environment 
(HSE) 
policy 
for 
the 
proposed 
plant/Environmental Impact Assessment report of the project if above 10 MT. 
2.3.1 
Review of Submitted Documents and Drawings   
The submissions shall be reviewed in line with specifications listed in Section 3 of this 
document. The objective of DPR’s review is to ensure safety-in-design and sustainable 
operation of the Gas Reticulation Facility. Site inspection shall follow the satisfactory 
review of the documents and design.  The site inspection shall, at the minimum, revalidate 
the requirements of the SSA. 
2.3.2 
Conditions for Approval to Construct/Install 
Approval to Construct shall have a validity of 30 months (in the first instance) on the 
following conditions: 
i. 
The facility shall commence meaningful development. The company shall update 
the nearest DPR office at least every six months interval. 
ii. 
Signpost shall be installed on-site immediately after the Approval to Construct is 
granted. The signpost should indicate the name of the company and the reference 
number of the Approval letter. 
iii. 
The construction and installation shall comply with the requirements stated in 
Section 3.  
iv. 
Companies involved in building of the facility, construction and fabrication of 
Storage tanks shall possess valid and appropriate DPR Oil and Gas Industry Service 
Permits.