Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 17 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT OF LPG REFILLING FACILITIES AND RETAILERS’ OUTLETS IN NIGERIA Code: DPR Guide 0019 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 8 2.8 Decommissioning LPG Refilling Facility All applications shall be forwarded to the DPR Operations Controller having jurisdiction over the Facility, giving full details of the proposal. Decommissioning shall be in line with relevant Nigerian Oil & Gas Regulations and Guidelines applicable to such facilities. 3 MINIMUM DESIGN, CONSTRUCTION AND INSTALLATION REQUIREMENTS 3.1 General Requirements The design, construction, installation commissioning and operation shall comply with the provisions of Petroleum act 1969 as amended, MOSR 1997, other applicable Regulations, Standards and Guidelines. The design and construction of such facilities in LPG Refilling Facility must conform to acceptable design codes such as Standards Organization of Nigeria, American Society of Mechanical Engineers, National Fire Protection Association, American Welding Society – Structural Welding Code, British Standards (BS), and other codes and standards recognised by the Director of Petroleum Resources. 3.1.1 Design and Construction Standard During the design, construction, installation, commissioning of a facility, all necessary measures and mitigations shall be applied to reduce risk associated with storage, transport, transfer, usage etc. to as low as reasonably practicable (ALARP). The storage tanks, fittings, pumps, manifolds, meters, hoses, valves, canopy and other equipment and accessories of the facility shall be designed for efficient and safe operations in line with applicable codes and standards. The installation and commissioning of the system shall only be undertaken by competent persons and company, in accordance with manufacturer's instructions and best practices. Written standard procedures in line with the DPR SOP template shall be drawn up and used for installation and/or commissioning. Further conditions governing the establishment of LPG Refilling Facility are as follows: i. Participation of DPR representatives in the project and mandatory witnessing of milestone construction activities such the tank burial, pressure/leak test of the
OtherPDF17