Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 171 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF A GAS RETICULATION FACILITY IN NIGERIA Code: DPR Guide 0028 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 6 x. Factory Acceptance Tests (FATs)/reports (where applicable) and Site Acceptance Tests of all critical components shall be witnessed by the Department. FATs from the manufacturer may be accepted where it is practically impossible to witness by the Department. 2.5 Procedure for Pre-License Inspection In order to issue LTO, the DPR shall conduct a Pre-license inspection, following the satisfactory review of documents submitted in the application. The inspection shall confirm the extent of compliance with these Guidelines. At a minimum, the following shall be confirmed to be in place: i. Organogram, list of competent persons and evidence of MISTDO training of staff. ii. Functional Automated/Manual leak tester. iii. Installation of Gas detectors and Functional Fire alarms shall be required for the LPG storage, gas distribution network and in every housing unit/apartment. iv. Safety warning notices and Personnel Protective Wears for the Plant operators. v. Quick shut-off valves shall be provided. vi. Visible display of Emergency Telephone numbers of Fire Service, Police and DPR. vii. Water sprinkler system in line with relevant codes and standards. viii. Muster Point designated areas earmarked in the facility. ix. Escape rope(s) or ladder(s) for high-rise apartments. x. Hoses shall be checked regularly to ensure that they are properly secured with hose clips. Damaged hoses or hoses showing signs of wear, shall be replaced with hose(s) of correct quality. xi. A fence of at least 2 metres high shall be provided to enclose the facility. xii. Fire blankets. xiii. Fire Hydrant system/control points and booster pumps.
OtherPDF171