Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 172 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF A GAS RETICULATION FACILITY IN NIGERIA Code: DPR Guide 0028 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 7 xiv. Adequate fire extinguishers shall be provided (DCP and CO2). xv. Demarcation of facility tank Storage areas to unauthorized persons and limiting access to operations area to only trained personnel. 2.5.1 Renewal of License to Operate On the expiration of an existing LTO, the company shall apply for the renewal of LTO. The company shall pay the applicable fee and submit relevant documents used for the LTO application. DPR officers shall conduct an inspection of the facility and auxiliary equipment to confirm the status and integrity of all equipment amenities in line with applicable standards. 2.6 Modification of Facility The company shall apply and submit the following documents and pay the prescribed application fee. i. Details of the proposal for modification. ii. The As-built layout drawing for the existing facility. iii. Proposed layout sketch for the facility. iv. Detailed and legible Piping and Instrumentation Diagram (P&ID) of the proposed facility. v. Updated Standard Operating Procedure (SOP) consistent with this guide. vi. Manufacturers' datasheet of the storage tank(s), where applicable. Note: Facility Inspection shall apply. 2.7 Decommissioning/Conversion of Facility All applications that fall under this category shall be forwaded to the DPR Operations Controller having jurisdiction over the Facility. Decommissioning shall be in line with relevant Nigerian Oil & Gas Regulations and Guidelines applicable to such facilities.
OtherPDF172