Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 174 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF A GAS RETICULATION FACILITY IN NIGERIA Code: DPR Guide 0028 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 9 by the Department. 3.2 Facility Layout & Site Selection 3.2.1 Site Selection Criteria 1. Any site chosen for the facility shall be sufficiently spacious to allow it to be designed to minimize the risks from LPG to any structure close to the facility and person likely to be at or near the facility. 2. The site shall, at the minimum, meet the following requirements: i. It shall be accessible from the roadside. ii. It shall not be within, under, or close to known hazards such as pipeline Right of Way (ROW), high voltage cable, railways, etc. iii. The minimum horizontal distance between the shell of a pressurized tank and the line of adjoining property that may be developed shall be as shown in Table 3.1. Where residences, public buildings, places of assembly, or industrial sites are located on adjacent property, greater distances or other supplemental protection (firewall/underground tank) as provided in Table 3.1 shall apply. iv. The drainages to be constructed or existing ones shall not be channelled to a stream or waterway. Contaminated water shall be contained and treated onsite. 3.2.2 Facility Layout for Gas Reticulation Site 1. Proper Hazard Area Classification and Risk Assessment shall be considered for safe design, layout and operations of the facility to minimize, to ALARP, the releases of containments to prevent the ignition and spread of any unavoidable or accidental releases. 2. The location of tanks, fill points, vent pipes, road tanker delivery stands, buildings, etc. shall be designed to ensure in the layout of the facility, that: i. Satisfactory means of escape for persons in the event of a fire or other incident are provided.
OtherPDF174