Applicable to all Oil & Gas Operators  
GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF A GAS 
RETICULATION FACILITY IN NIGERIA 
Code: DPR Guide 0028 - 2020 
 
Revision Date: 1st September 2020 
 
 
 
This is a property of the Department of Petroleum Resources. All rights reserved  
 
11 
Table 3.2 Underground Distance 
Capacity (Metric Tonnes) 
Separation Distance (Meters) from the relief valve to the line of Adjoining 
Properties, Control buildings, or fixed source of ignition. 
0.1 - 10 
3 
>10.1 
7.5 
 
3.3 
Minimum Requirement for Gas Storage Vessel/Tanks   
The storage tank/vessel shall be designed, constructed and installed by DPR accredited 
company in accordance with internationally recognised standards.  It shall comply with the 
following: 
i. 
The storage tank/vessel shall be located in a manner that allows safe access and 
subsequent removal if required, clear of any building foundations or underground 
features, such as drains and tunnels. Additionally, the location shall not allow any 
flammable concentrations or any releases to reach potential ignition sources or 
accumulate where they might pose a danger. 
ii. 
The fill points for storage tank/vessel shall be positioned such that other vehicle 
movements do not pose risk to tanker discharge, and accidental releases or 
subsequent ignition does not pose an immediate threat to personnel.  
iii. 
Tanks and piping must be constructed with materials that provide an appropriate 
level of safety and environmental protection. E.g. carbon steel, reinforced fibre 
glass, or others acceptable to DPR. 
iv. 
All storage tank design specification details shall be conspicuously displayed. 
v. 
All storage tanks shall be fitted with pressure relief valves, pressure and 
temperature gauges, and other important safety equipment. Lightning protection 
shall be installed as appropriate.