Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 180 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF A GAS RETICULATION FACILITY IN NIGERIA Code: DPR Guide 0028 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 15 meet the following at the minimum: i. Hose connections and flexible connectors shall be fabricated of materials that are resistant to the action of LP gas both as liquid and vapour. ii. Pressure-containing metal parts of valves shall be made of steel, ductile (nodular) iron, malleable iron or brass. iii. Manual shut-off valves, emergency shut-off valves, overpressure shut-off valve, flow check valves, non-return valves and back flow check valves used in piping system shall comply with the provisions for LPG storage and installation valves. iv. Proper flow control using approved Pressure Regulation Systems (PRS). v. Emergency shut-off valves shall be approved and shall incorporate all the following means of closing: a. Automatic shut-off through thermal (fire actuation). b. Manual shut-off from a remote location. c. Manual shut-off at the installed location. vi. Pressure, temperature, level and flow gauges should be incorporated into the system to ensure proper control and monitoring of the installation. vii. For gas piping installed underground, a sufficient clearance from any other underground structure to avoid contact therewith. Clearance for the piping shall be provided to allow maintenance, and to protect against damage from proximity to other structures. viii. Gas piping that shall be in contact with earth or other corrosive materials shall be protected against corrosion. When dissimilar metals are joined underground, an insulating coupling or fitting shall be used. ix. Adequate protection shall be provided for gas piping installed underground so as to prevent excessive stressing of the piping. Piping shall be buried in a manner that shall protect the piping from physical damage: a. A minimum of 300mm cover shall be provided for underground piping
OtherPDF180