Applicable to all Oil & Gas Operators  
GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF A GAS 
RETICULATION FACILITY IN NIGERIA 
Code: DPR Guide 0028 - 2020 
 
Revision Date: 1st September 2020 
 
 
 
This is a property of the Department of Petroleum Resources. All rights reserved  
 
16 
systems. 
b. Where damage to pipe from external forces is likely to occur, then a 
minimum cover of 460mm shall be provided. 
c. Where a minimum cover of 300mm cannot be provided, the pipe shall be 
installed in a conduit or bridged (shielded).  
3.5 
Master Switches 
In addition to the site main isolator controlling the electrical installation, a separate 
isolation switch should be provided to isolate the supply to the LPG installation. This should 
be so positioned as to be readily visible and within easy reach for quick operation in cases 
of emergency. 
3.6 
Pumps, Compressors and Fittings 
Pumps, other than submersible types, should be adequately secured to a concrete 
foundation or bolted to a structural steel support. Where the drive unit is not integral with 
the pump, attention should be given to ensure correct alignment, and all moving parts 
should be suitably guarded. 
3.7 
Manifolds 
Manifolds are to be securely fixed to avoid strain on connections under normal working 
conditions. On a housing estate forecourt, such connection valves should be immediately 
downstream of the shear valve or excess flow valve protecting the meter. 
3.8 
Pressure And Flow Control 
The piping manifold used for the supply of LPG to compound or building site shall be 
designed and installed to ensure uninterrupted and safe LPG supply in active and standby 
operations mode. LPG flow shall be delivered through pigtails and controlled through 
three-stage Pressure Regulation System (PRS) to residential units.