Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 19 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT OF LPG REFILLING FACILITIES AND RETAILERS’ OUTLETS IN NIGERIA Code: DPR Guide 0019 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 10 design, layout and operation of the facility to minimize, to as low as reasonably practicable, the releases of containments and to prevent the ignition and spread of any unavoidable or accidental releases. 2. The location of tanks, fill points, vent pipes, dispensers, road tanker delivery stands buildings, etc. shall be designed to ensure in the layout of the facility, that: i. Satisfactory means of escape are provided for persons in the event of a fire or other incident, ii. Hazardous areas are protected from sources of ignition, iii. Safe access, routing, parking and exit for service vehicles and road tankers are provided. 3. LPG Refilling Facility dangerous areas shall be in open air ventilation and clear of other buildings or obstructions that might otherwise adversely affect the ventilation. 4. Pipework, tanks to offset fill points, dispensers and vent pipes shall be routed and located to ensure protection of LPG Refilling Facility from external effects or interference and allow access if required. 5. The stand for delivering vehicle fuels into storage tanks shall be in the open, away from LPG Refilling Facility buildings, dispensing activities and emergency escape routes, and be large enough to allow a road tanker to be positioned wholly within it during delivery. 6. Electrical connections shall be made in accordance with the manufacturer's instructions and shall maintain the integrity of the explosion protection. 3.3 LPG Storage Vessel Specification and Requirements The storage tank/vessel shall be designed, constructed and installed by DPR accredited/approved company in accordance with internationally recognised standards. It shall comply with the following: i. The storage tank/vessel shall be located in a manner that allow safe access and subsequent removal if required, clear of any building foundations or underground
OtherPDF19