Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 190 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF A GAS RETICULATION FACILITY IN NIGERIA Code: DPR Guide 0028 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 25 vi. Training records. vii. Operator Training Reports viii. Copies of Inspection reports carried out. ix. Maintenance Records. x. Approved checklist for the facility. xi. Operations Report inline with Section 4.18 xii. SOP xiii. Waste management plan. xiv. Waste consignment note 4.16 Static Electricity in Operations: 1. The Facility must ensure that all equipment are bonded continuously or designed to eliminate the threat of discharge of static electricity. 2. During the Pumping or discharging from a truck, the Facility shall ensure the grounding of the truck and securing bonding wire to the tank being filled and it shall not be removed during operations until it is confirmed that there is no threat of static electricity. 4.17 Storage Tanks Management 1. Storage tanks shall be maintained in good condition to prevent loss of containment. 2. At the minimum, the tanks shall be equipped and inspected for Safety Elements, Overfill Protection, visible leaks e.t.c 3. The effectiveness of a cathodic and corrosion protection shall be regularly monitored and maintained in accordance with the design standards. Pad, foundation or supports, tank welds shell seams, and bottom to side seams shall also be free from rust. 4. Ensure that vents are clear of debris or other plugging to ensure fumes can escape,
OtherPDF190