Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 192 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF A GAS RETICULATION FACILITY IN NIGERIA Code: DPR Guide 0028 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 27 4.18 Operations Report and Returns All Gas Storage and Utilisation Facility shall furnish the DPR with periodic reports (on quarterly bases or as may be required). The report shall detail the volume of product received and utilised, price, operational highlights and issues during the period. 4.19 Reporting of Incidents 1. The Facility shall establish procedure for reporting, documenting, follow-up and closing out near misses, incidents and accidents. 2. Whenever fire occurs at the Facility or in case of serious injury or fatality , a report of the circumstances and probable cause of the fire shall be forwarded to the nearest DPR inspector or office within 24 hours and to the Director of Petroleum Resources within 48 hours of the occurrence. 5 SANCTIONS These Guidelines provide the requirements for establishing Gas Reticulation Facility in Nigeria and minimum requirement for operating same safely. Non-compliance with the requirements of these Guidelines shall be deemed as violations to relevant sections of the Petroleum Act 1969 as amended, Petroleum (Drilling and Production) Regulations 1969 & subsequent amendments, and Mineral Oils (Safety) Regulation, 1997. These violations may summarily result in applicable consequence management, including, but not limited to, fines, penalties, revocation of license.
OtherPDF192