Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 26 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT OF LPG REFILLING FACILITIES AND RETAILERS’ OUTLETS IN NIGERIA Code: DPR Guide 0019 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 17 such an event occur and ensure timely emergency response and escape of all persons in the facility. 2. The fire protection measures shall cater and ensure that adequate controls are put in place, including special, technical and organizational measures taken for all work process, including receipt, storage and other activities in connection with the LPG Refilling Facility to prevent fire/explosion; deal with the incident should such an event occur; and ensure emergency response and escape of all persons in the facility. 3. Additionally, the LPG Refilling Facility shall provide for the following firefighting and emergency facilities at the minimum: i. Clean water reservoir of minimum size 15 cubic metres ii. Functional firefighting gadgets must be kept handy and at alert. iii. At least two dry chemical powder fire extinguishers less than 9kg each and suitable for gas fires with a test fire rating of at least 21A and 183B as defined in MSA EN 3-7:2004 should be readily available at strategic locations to deal with fires adjacent to the meter/vehicle being filled. 3.9 Fire/Blast Walls When Fire walls are used, the walls shall be of the following features at the minimum: i. Imperforated and substantially constructed from reinforced concrete or solid masonry and be capable of achieving at least 30 minutes fire resistance. Where the wall separates vulnerable populations from the dangerous substance, the fire resistance provided shall be for a minimum of 60 minutes. ii. Shall not be less than the height of the vessel or the height of the vessel, whichever is greater. iii. The thickness of the Firewall shall not be less than of 0.23m (9 inch) iv. The separation distance between the vessel and the firewall shall not be less than 3 meters.
OtherPDF26