Afrindustria/ Gas Gap Monitor

Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY

GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY

Page 3 of 194

Open the PDF at page 3

 
 
 
 
Applicable to all Oil & Gas Operators  
 
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES  IN NIGERIA 
 
 
INTRODUCTION 
This Guideline is issued pursuant to the Petroleum Act 1969, Mineral Oils (Safety) 
Regulations 1997 and the Petroleum Regulations 1967.  
This 
document is 
a 
compilation 
of 
Guidelines 
that stipulates 
the 
minimum 
requirements, procedures and conditions to be fulfilled before the grant of 
approvals and/or licences for the construction, installation, modification, takeover, 
relocation and operations of Downstream Gas Facilities in Nigeria.   
These Guidelines are developed to enhance gas penetration and utilisation in the country 
as well as ease of doing business in the Nigerian oil and gas industry.