Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 3 of 194
Applicable to all Oil & Gas Operators GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA INTRODUCTION This Guideline is issued pursuant to the Petroleum Act 1969, Mineral Oils (Safety) Regulations 1997 and the Petroleum Regulations 1967. This document is a compilation of Guidelines that stipulates the minimum requirements, procedures and conditions to be fulfilled before the grant of approvals and/or licences for the construction, installation, modification, takeover, relocation and operations of Downstream Gas Facilities in Nigeria. These Guidelines are developed to enhance gas penetration and utilisation in the country as well as ease of doing business in the Nigerian oil and gas industry.
OtherPDF3