Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 39 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE STANDARD OPERATIONS OF LPG REFILLING FACILITY IN NIGERIA Code: DPR Guide 0043 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 6 xvii. Detailed procedures and precautionary measures to be taken during discharge operations shall be enumerated in the plant SOP 4.3 Cylinder Refilling Operations At the minimum, the following shall apply: i. Only duly trained and certified operators shall perform the cylinder filling operations in the filling shed. ii. The operators must receive proper training on the handling of LPG and be conversant with operations of fire-fighting equipment, emergency shut-down buttons and other emergency procedures. iii. The filling shed is a restricted area and this provision shall be strictly enforced. iv. The operator shall physically inspect the cylinder bottles before filling. v. The operator shall provide a master scale (similar to that used at the filling shed) in a designated area accessible to the customer to enable the client to verify the quantity of LPG filled into the cylinder. 4.4 General Housekeeping Procedures At the minimum, the following applies i. Good housekeeping procedures shall be developed by the plant owner in accordance with the provisions of the Petroleum Regulations. ii. A competent person shall be designated to implement the developed housekeeping procedures. iii. The procedures shall include key activities that require daily attention and routine inspection. iv. The competent person shall check the housekeeping records and ensure full implementation of established procedures.
OtherPDF39