Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 42 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE STANDARD OPERATIONS OF LPG REFILLING FACILITY IN NIGERIA Code: DPR Guide 0043 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 9 vii. No unauthorised persons shall gain access to an LPG plant. A proper work permit system incorporating formal procedures shall be established for hot work, cold work and entry into bulk tanks etc. viii. Records of major Inspections and maintenance shall be duly kept and made available to officials of the Department on demand. ix. An annual report of the safety conditions and general housekeeping of the LPG plant shall be prepared by an accredited company and submitted to the Department by December 31st of each year. 6. DOCUMENTATION AND RECORD KEEPING 1. LPG Refilling Facility shall be required to put in place adequate Document control that ensure the easy retrieval and protection of records. Records of all activities pertaining to the facility should be kept on location, these documents should include but are not limited to i. License to Operate, ii. Emergency procedures, iii. Traffic management plan, iv. Security Plan, v. Spill Prevention Control and Countermeasure Plans, vi. Facility Response Plans, vii. Operation Manual, viii. Training records, ix. Operator Training Reports, x. Copies of Inspections reports carried out, xi. Maintenance Records, xii. Approved checklist for the facility,
OtherPDF42