Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 54 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT OF AN AUTOGAS REFUELLING STATIONS AND ADD-ON GAS FACILITY IN NIGERIA Code: DPR Guide 0042 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 1 1 INTRODUCTION 1.1 Purpose The purpose of this document is to describe the procedures and conditions for approving the establishment of Autogas Refuelling Stations and Add-On Facilities in Nigeria pursuant to the Petroleum Regulations 1967. It provides the baseline requirements for the safe design and construction of Autogas Refuelling Stations and Add-On Facilities, to ensure the risk in Facility is minimised to as low as reasonably practicable. 1.2 Scope These guidelines and requirements apply to processes for obtaining various approvals and license for the establishment of LPG Autogas, LNG and CNG Refuelling stations and their Add-On Refuelling and Refilling skid on existing petroleum products Retail Outlets in Nigeria. 1.3 Definition of Terms I. Autogas and Refuelling Facility This refers to a facility designated for the sale of Gas products (LNG, CNG, LPG) to Vehicles and Automobiles. They are similar to the Petroleum Product Retail Outlets. The License issued for the facility are as follows: a. LTO for LNG Refuelling facility when the Gas product is LNG b. LTO for CNG Refuelling facility when the Gas product is CNG c. LTO for LPG Autogas facility when the Gas product is LPG II. Retail Outlet Gas Add-On Facility This refers to the instance where existing/licenced Petroleum Product Retail Outlets introduces a facility within the station for the purposes of selling Gas Product (LNG, CNG,
OtherPDF54