Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 57 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT OF AN AUTOGAS REFUELLING STATIONS AND ADD-ON GAS FACILITY IN NIGERIA Code: DPR Guide 0042 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 4 facility. The company shall pay the applicable fees, upload the required documents, and satisfy the following requirements: i. A letter/ approved building plan from the appropriate Town Planning Authority, authorizing the siting of the facility at the proposed site. The submission shall contain all relevant drawings such as: a. Piping and Instrumentation Diagram (P&ID), b. Electrical and mechanical specifications, c. Codes, Standards and Specification adopted in the design, construction and installation of ancillary equipment. Note: (The town planning approval may be exempted for Add-on facilities) ii. A fire report by Chief Federal/State Fire officer or an officer authorized by him, stating satisfaction with the proposed arrangement for the prevention of fire. iii. Any of the following shall subsist - Current Tax clearance certificate, Evidence of Tax Payment, Tax Identification Number (TIN) or evidence of tax exemption. iv. Health Safety and Environment (HSE) policy for the proposed Facility/Environmental Impact Assessment report of the project if above 10 MT. v. An approval letter from the Divisional Police Officer where the facility will be sited or an officer authorized to act on his behalf, stating that the station will not obstruct traffic or constitute any security hazard during its operations. (This is not required for Add-on Gas facilities). 2.3.1 Review of Submitted Documents The submissions shall be reviewed in line with specifications listed in section 3 of this document. The objective of DPR’s review is to ensure safety-in-design and sustainable operation of the Autogas Refuelling Station or Add-on Gas facility. Site inspection shall
OtherPDF57