Applicable to all Oil & Gas Operators  
GUIDELINES FOR THE ESTABLISHMENT OF AN AUTOGAS 
REFUELLING STATIONS AND  ADD-ON GAS FACILITY IN NIGERIA 
Code: DPR Guide 0042 - 2020 
 
Revision Date: 1st September 2020 
 
 
 
This is a property of the Department of Petroleum Resources. All rights reserved  
 
5 
follow the satisfactory review of the documents and design.  The site inspection shall, at a 
minimum, revalidate the requirements of the SSA. 
 
2.3.2 
Conditions for Approval to Construct/Install 
Approval to Construct shall have a validity of thirty (30) months on the following 
conditions (in the first instance): 
i. 
The facility shall commence meaningful development. The company shall update 
the nearest DPR office at six months intervals. 
ii. 
Signpost shall be installed on-site immediately after the Approval to construct is 
granted. The signpost should indicate the name of the company and the reference 
number of the Approval letter. 
iii. 
The construction and installation shall comply with the requirements stated in 
Section 3.  
iv. 
Companies involved in building of the facility, construction and fabrication of 
Storage tanks shall possess valid and appropriate DPR Oil and Gas Industry Service 
Permits. 
2.4 
License to Operate (LTO)  
Upon completion of construction works and leak tests, the company shall apply for LTO. 
The company shall pay the applicable fees, and upload all statutory/technical requirements 
on the portal as follows: 
i. 
Valid Calibration Certificates/Report of Measuring Equipment for the facility issued 
by DPR accredited companies and witnessed by DPR in line with relevant standards. 
ii. 
Manufacturers’ data sheet for any Autogas Refuelling Station and Add-On Facility 
storage tanks. 
iii. 
Ultrasonic Thickness Measurement (UTM) test certificates of the storage tank. This 
test shall be conducted on site for all tanks and done prior to burial for underground