Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 58 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT OF AN AUTOGAS REFUELLING STATIONS AND ADD-ON GAS FACILITY IN NIGERIA Code: DPR Guide 0042 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 5 follow the satisfactory review of the documents and design. The site inspection shall, at a minimum, revalidate the requirements of the SSA. 2.3.2 Conditions for Approval to Construct/Install Approval to Construct shall have a validity of thirty (30) months on the following conditions (in the first instance): i. The facility shall commence meaningful development. The company shall update the nearest DPR office at six months intervals. ii. Signpost shall be installed on-site immediately after the Approval to construct is granted. The signpost should indicate the name of the company and the reference number of the Approval letter. iii. The construction and installation shall comply with the requirements stated in Section 3. iv. Companies involved in building of the facility, construction and fabrication of Storage tanks shall possess valid and appropriate DPR Oil and Gas Industry Service Permits. 2.4 License to Operate (LTO) Upon completion of construction works and leak tests, the company shall apply for LTO. The company shall pay the applicable fees, and upload all statutory/technical requirements on the portal as follows: i. Valid Calibration Certificates/Report of Measuring Equipment for the facility issued by DPR accredited companies and witnessed by DPR in line with relevant standards. ii. Manufacturers’ data sheet for any Autogas Refuelling Station and Add-On Facility storage tanks. iii. Ultrasonic Thickness Measurement (UTM) test certificates of the storage tank. This test shall be conducted on site for all tanks and done prior to burial for underground
OtherPDF58