Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 59 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT OF AN AUTOGAS REFUELLING STATIONS AND ADD-ON GAS FACILITY IN NIGERIA Code: DPR Guide 0042 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 6 tanks. The UTM test shall be carried out by a company with applicable OGISP and witnessed by the DPR. iv. Pressure test reports and certificate or any other DPR approved integrity test report for tanks and piping. The Pressure test shall be carried out by company with applicable OGISP and witnessed by the Department. The Pressure test should be carried out for a new tank at installation before operation and after every Five (5) years. After 20 years of service, pressure test on the LPG tank should be carried out every two (2) years. v. Any of the following shall subsist - Current Tax clearance certificate, Evidence of Tax Payment, Tax Identification Number (TIN) or evidence of tax exemption. vi. List and evidence of trained staff by a consultant with applicable OGISP. vii. Approved Standard Operating Procedure (SOP) for the proposed facility operations in line with the DPR SOP template. viii. ‘8 x 10’ size Photographs of Plant from different vantage points showing its amenities. ix. As built Layout drawing. This will be verified by DPR during pre-licence inspection. x. Factory Acceptance Tests (FATs)/reports (where applicable) and Site Acceptance Tests of all critical components shall be witnessed by the Department. xi. Price Display Board Note: For Retail outlet Add on Facility, the LTO for the retail outlet will be submitted 2.5 Procedure for Pre-License Inspection In order to issue LTO to the facility, the DPR shall conduct a Pre-license inspection, following the satisfactory review of documents submitted in the application. The inspection shall confirm extent of compliance with these Guidelines. At the minimum, the following shall be confirmed to be in place:
OtherPDF59