Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 61 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT OF AN AUTOGAS REFUELLING STATIONS AND ADD-ON GAS FACILITY IN NIGERIA Code: DPR Guide 0042 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 8 xvii. A visible chart of operations procedure for loading and unloading operations at the tie-in point or loading area. xviii. Adequate fire water storage, deluge and sprinkler system in line with relevant codes and standards. xix. Functional Fire alarm system and mounted gas detectors at designated areas (Like pump and compressor room, discharge/offloading area and piping connector at the storage vessel, etc). xx. Power Generator or other alternative source power. xxi. Well-stocked First Aid Box xxii. Fire Hydrant system/control points and booster pumps 2.5.1 Renewal of License to Operate On the expiration of an existing LTO, the company shall apply through the online portal, for the renewal of LTO. The company shall pay the applicable fee and upload relevant document used for the LTO application. DPR officers shall conduct an inspection of the facility and auxiliary equipment to confirm at the minimum the status and integrity of all equipment amenities in line with the standards. 2.6 Relocation of Existing Facility If a company desires to relocate an existing and licensed Refuelling Station to a new site, the applicant must submit the justification (reasons) for the proposed relocation of the facility to DPR. The conditions for the grant of Approval to Construct and LTO for a new refuelling station shall be the same for relocated refuelling station.
OtherPDF61