Applicable to all Oil & Gas Operators  
GUIDELINES FOR THE ESTABLISHMENT OF AN AUTOGAS 
REFUELLING STATIONS AND  ADD-ON GAS FACILITY IN NIGERIA 
Code: DPR Guide 0042 - 2020 
 
Revision Date: 1st September 2020 
 
 
 
This is a property of the Department of Petroleum Resources. All rights reserved  
 
8 
xvii. 
A visible chart of operations procedure for loading and unloading operations at 
the tie-in point or loading area.  
xviii. 
Adequate fire water storage, deluge and sprinkler system in line with relevant 
codes and standards. 
xix. 
Functional Fire alarm system and mounted gas detectors at designated areas 
(Like pump and compressor room, discharge/offloading area and piping 
connector at the storage vessel, etc). 
xx. 
Power Generator or other alternative source power.   
xxi. 
Well-stocked First Aid Box 
xxii. 
Fire Hydrant system/control points and booster pumps  
 
2.5.1 
Renewal of License to Operate 
On the expiration of an existing LTO, the company shall apply through the online portal, 
for the renewal of LTO. The company shall pay the applicable fee and upload relevant 
document used for the LTO application. DPR officers shall conduct an inspection of the 
facility and auxiliary equipment to confirm at the minimum the status and integrity of all 
equipment amenities in line with the standards. 
2.6 
Relocation of Existing Facility 
If a company desires to relocate an existing and licensed Refuelling Station to a new site, 
the applicant must submit the justification (reasons) for the proposed relocation of the 
facility to DPR. The conditions for the grant of Approval to Construct and LTO for a new 
refuelling station shall be the same for relocated refuelling station.