Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 62 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT OF AN AUTOGAS REFUELLING STATIONS AND ADD-ON GAS FACILITY IN NIGERIA Code: DPR Guide 0042 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 9 2.7 Lease/Takeover of Facility The company for Lease/Takeover of a Site Suitability Approval (SSA), ATC and LTO shall pay the applicable fees and submit the following documents. i. Duly signed Sales Agreement by both parties. ii. Letter of Release. The requirements as applicable for SSA, ATC and LTO shall apply. Inspection shall be carried out as part of the process. 2.8 Modification of Facility The company shall apply and submit the following documents and pay the applicable fees through the online portal. i. Details of proposal for modification. ii. The As-built layout drawing for the existing facility. iii. Proposed layout sketch for the facility. iv. Detailed Piping and Instrumentation Diagram (P&ID) of the proposed facility. v. Updated Standard Operating Procedure (SOP) consistent with this guide. vi. Manufacturers' datasheet of the storage tank(s), where applicable. Note: Facility Inspection shall apply. 2.9 Decommissioning/Conversion of Facility All applications that fall under the above classification shall be in hard copy addressed to the DPR Operations Controller having jurisdiction over the Facility, giving full details of the proposal. Decommissioning shall be in line with the relevant Nigerian Oil & Gas Regulations and Guidelines applicable to such facilities. If a company wishes to covert to Autogas Refuelling station, the requirements of ATC and LTO in line with the guideline shall apply.
OtherPDF62