Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 63 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT OF AN AUTOGAS REFUELLING STATIONS AND ADD-ON GAS FACILITY IN NIGERIA Code: DPR Guide 0042 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 10 3 MINIMUM DESIGN, CONSTRUCTION, AND INSTALLATION REQUIREMENTS 3.1 General Requirements The design, construction, installation, commissioning, and operation shall comply with the provisions of Petroleum Act 1969 as amended and MOSR 1997; conform to acceptable design codes such as Standards Organization of Nigeria , American Society of Mechanical Engineers, National Fire Protection Association, American Welding Society – Structural Welding Code, British Standards (BS), and other codes and standards recognised by the Director of Petroleum Resources. 3.1.1 Standards For Design and Construction During the design, construction, installation, commissioning of a facility, all necessary mitigations shall be applied to reduce risk associated with storage, transport, transfer, usage of gas to as Low as reasonably practicable (ALARP). The storage tanks, fittings, pumps, manifolds, meters, hoses, valves, and other equipment and accessories of the facility shall be designed for efficient and safe operation in line with applicable codes and standards. The installation and commissioning of the system shall only be undertaken by competent persons and companies, in accordance with manufacturer's instructions and industry best practices. Further conditions governing the establishment of Autogas Refuelling or Add-On Gas Facilities are as follows: i. Participation of DPR representatives in the project and compulsory witnessing of milestone construction activities such as tank burial, pressure/leak test, and calibration of tanks. ii. All critical equipment and piping shall be commissioned after installation in accordance with manufacturer’s instructions. Integrity tests and other applicable tests shall be conducted companies with relevant OGISP permits and witnessed by the Department.
OtherPDF63