GUIDELINES FOR THE ESTABLISHMENT OF AN AUTOGAS 
REFUELLING STATIONS AND  ADD-ON GAS FACILITY IN NIGERIA 
Code: DPR Guide 0042 - 2020 
 
Revision Date: 1st September 2020 
 
 
 
This is a property of the Department of Petroleum Resources. All rights reserved  
 
24 
i. Pipes and pipework components (including weld/braze compounds) shall be of a 
material that is resistant to corrosion.  Underground and aboveground piping shall 
also be protected from corrosion in compliance to recognized best practices.   
ii. Special protection such as coatings or cathodic protection shall be considered and 
applied for pipe systems and valves.  For LNG connections, vacuum insulation of 
cryogenic pipes in ducts may apply. 
iii. Where practical, pipe shall be continuous, unjointed and uninterrupted. Where 
there are breaks in the continuity of pipework, consideration shall be given to 
electrical bonding across the joint.  Threaded pipe and fittings are not allowed 
underground. 
iv. Manual shut-off valves, emergency shut-off valves, overpressure shut-off valve, 
flow check valves, non-return valves and backflow check valves used in piping 
systems shall conform to applicable standards.  
v. Relief and safety valves shall be inspected by a DPR accredited consultant and 
witnessed by the Department every thirty (30) months or at such shorter intervals 
as shall be necessary to maintain them in satisfactory condition.  
vi. All pipework shall that are insulated should accessible to facilitate periodic 
inspection, examination and/or testing. 
 
3.5.1 
 Pressure Relief Systems 
Relief devices shall be designed such that the operations safely disperse contents without 
the risk of accumulation, ignition, or impingement on personnel, equipment and buildings.  
For LNG, the following applies at the minimum: 
i. All vents including those of safety relief devices and purge valves shall be 
connected to a vent stack and/or any other boil-off gas utilization systems put in 
place.