GUIDELINES FOR THE ESTABLISHMENT OF AN AUTOGAS 
REFUELLING STATIONS AND  ADD-ON GAS FACILITY IN NIGERIA 
Code: DPR Guide 0042 - 2020 
 
Revision Date: 1st September 2020 
 
 
 
This is a property of the Department of Petroleum Resources. All rights reserved  
 
25 
ii. All vent systems shall be adequately supported to cope with loads created during 
discharge, as well as those created by the weather e.g. wind loading. 
iii. Natural gas vent lines shall terminate in a safe area at high level therefore, vent 
systems shall be designed to discharge vertically upwards. 
iv. The minimum pressure-relieving capacity in kilogram per hour shall not be less than 
three percent (3%) of the full tank content in 24 hours.  
v. The following notices shall be clearly displayed on or near the vent stack(s), 
particularly at personnel access points.  
a. do not spray water on vent stack  
b.  flammable gas 
c. beware of frostbite   
vi. Conductive parts (e.g. metal fitments) on the installation including fencing, gates, 
tanks and all pipework, vent stacks and vent recovery hoses, shall be adequately 
equipotential (earth) bonded.  
3.6 
Pumps, Compressors and Fittings 
Pumps, other than submersible types, should be adequately secured to a concrete 
foundation or bolted to a structural steel support. Where the drive unit is not integral with 
the pump, attention should be given to ensure correct alignment, and all moving parts 
should be suitably guarded 
 
3.7 
Emergency Systems 
The following emergency system shall be installed in the facility at the minimum: 
i. 
Gas and fire detection system shall be installed and routinely tested.  
ii. 
Appropriate warning notices, safety signs and instructions, shall be positioned at 
strategic locations and control rooms. Audio/visual alarms that is routinely tested 
is mandatory for LNG.