Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 79 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT OF AN AUTOGAS REFUELLING STATIONS AND ADD-ON GAS FACILITY IN NIGERIA Code: DPR Guide 0042 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 26 iii. Adequate intrinsically safe lighting systems of explosion-proof type shall be installed at points to aid safety, security and dentification of the product(s) (signage and labels). Note: vent outlets and potential release points shall be avoided iv. Where numerous storage vessels are used, consideration should be given to separating these into isolatable sub-groups. ESDs activating these isolation valves shall be provided both locally at each exit point from the storage site and remotely. 3.8 Fire/Blast Walls When Fire walls are used as specified in Section 3.3, the walls shall, at a minimum, be of the following features: i. imperforated and substantially constructed from reinforced concrete or solid masonry and be capable of achieving at least 30 minutes fire resistance. Where the wall separates vulnerable populations from the dangerous substance, the fire resistance provided shall be for a minimum of 60 minutes. ii. shall not be less than the height of the vessel or the height of the vessel, whichever is greater. iii. The thickness of the Firewall shall not be less than of 0.23m (9 inch) iv. The separation distance between the vessel and the firewall shall not be less than 3 meters. v. The installation of the fire walls shall not significantly impaired natural ventilation. The provision on one side is normally sufficient. However, it shall not be more than two sides.
OtherPDF79