Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 97 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF GAS STORAGE AND UTILISATION FACILITIES IN NIGERIA Code: DPR Guide 0020 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 6 ix. As built Layout drawing. This will be verified by DPR during pre-licence inspection. x. Factory Acceptance Tests (FATs)/reports (where applicable) and Site Acceptance Tests of critical components shall be witnessed by the Department. 2.5 Procedure for Pre-License Inspection To issue LTO for a facility, the DPR shall conduct a Pre-license inspection, following the satisfactory review of documents submitted in the application. The inspection shall confirm the extent of compliance with these Guidelines. At a minimum, the following shall be confirmed to be in place: i. Organogram, list of competent persons, and evidence of MISTDO training of the relevant staff. ii. Functional Automated/Manual leak tester. iii. Automatic monitoring and control systems. iv. Standard Operating Procedures. v. Functional Fire alarm system and mounted gas detectors at designated areas (Like pump and compressor room, discharge/offloading area and piping connector at the storage vessel, etc). vi. Safety warning notices and Personnel Protective Wears for personnel. vii. Emergency shut down system in at least two locations (At the Gate and operations area). viii. Visible display of Emergency Telephone numbers of Fire Service, Police and DPR. ix. Adequate fire water storage, deluge and sprinkler system in line with relevant codes and standards. x. Muster Point designated areas earmarked in the facility. xi. Car parking areas shall be provided outside the facility. Only cars with spark arrestors should be allowed to drive into the facility. However, safety distance
OtherPDF97