Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 98 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF GAS STORAGE AND UTILISATION FACILITIES IN NIGERIA Code: DPR Guide 0020 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 7 of 15m between the car and the storage tank/dispensing bay must be maintained. xii. Clean and hygienic toilets with steady water supply at the facility. xiii. Demarcation of facility tank Storage areas to unauthorized persons and limiting access to operations area to only trained personnel. xiv. A perimeter fence of at least 2 metres height shall be provided around the facility. xv. Well-stocked First Aid Box xvi. Fire Hydrant system/control points and booster pumps 2.5.1 Pre-License Inspection for New or Renewal of License of Operate On the expiration of an existing operating licence, the company shall apply through the online portal for LTO. The company shall pay the applicable fee and upload relevant documents used for the LTO application. DPR officers shall conduct an inspection of the Gas Storage and Utilisation Facility, to confirm at the minimum the status and integrity of all equipment and amenities in line with standards. 2.6 Relocation of Existing Facility If a company desires to relocate an existing and licensed facility to a new site, the applicant must submit the justification (reasons) for the proposed relocation of the facility. The conditions for the grant of Approval to Construct and operating license for a new Facility shall be the same for relocated Facility. 2.7 Lease/Takeover of Facility The company for Lease/Takeover of a Site Suitability Approval (SSA), ATC and LTO shall pay the prescribed application fee and submit the following documents.
OtherPDF98