Library / GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
GUIDE FOR THE ESTABLISHMENT AND OPERATIONS OF DOWNSTREAM GAS FACILITIES IN NIGERIA (LPG, CNG, LNG) ISSUED BY
Page 99 of 194
Applicable to all Oil & Gas Operators GUIDELINES FOR THE ESTABLISHMENT AND OPERATIONS OF GAS STORAGE AND UTILISATION FACILITIES IN NIGERIA Code: DPR Guide 0020 - 2020 Revision Date: 1st September 2020 This is a property of the Department of Petroleum Resources. All rights reserved 8 i. Duly signed Sales Agreement by both parties. ii. Letter of Release. The requirements as applicable for SSA, ATC and LTO shall apply. Inspection shall be carried out as part of the process. 2.8 Modification of Facility The company shall apply and submit the following documents and pay the applicable fees through the online portal: i. Details of proposal for modification ii. The As-built layout drawing for the existing facility. iii. Proposed layout sketch for the facility. iv. Detailed Piping and Instrumentation Diagram (P&ID) of the facility. v. Updated Standard Operating Procedure (SOP) consistent with this guide. vi. Manufacturers' datasheet of the storage tank(s), where applicable. Note: Facility inspection shall apply. 2.9 Decommissioning of Facility All applications shall be forwarded to the DPR Operations Controller having jurisdiction over the Facility, giving full details of the proposal. Decommissioning shall be in line with relevant Nigerian Oil & Gas Regulations and Guidelines applicable to such facilities. 3 MINIMUM DESIGN, CONSTRUCTION AND INSTALLATION REQUIREMENTS 3.1 General Requirements The design, construction, installation, commissioning and operation shall comply with the provisions of Petroleum act 1969 as amended, MOSR 1997; conform to acceptable design codes such as Standards Organization of Nigeria, American Society of Mechanical
OtherPDF99