Library / GUIDELINE-FOR-BARGING-AND-TRUCKING-OPERATIONS
GUIDELINE-FOR-BARGING-AND-TRUCKING-OPERATIONS
Page 4 of 5
P a g e | 4 Author : NMDPRA Publish Date: April, 2023 Revision : 1 iv. Name of Vessel/Barge/Truck. v. Load point (take off point). vi. Discharge port (destination). vii. Crude Quantity to be loaded. 2.4.2 Vessels/barges/trucks shall not be cleared/eligible for use in subsequent crude evacuation trips until the endorsed Certificates of Quantity issued at both the loading and discharge points for the previous trip have been submitted and reviewed by the Authority. 2.4.3 The Documentary Instruction (D.I) must be submitted 72 hours before the trip date. 2.5 Movement Authorisation 2.5.1 Clearances shall be obtained from NMDPRA HQ for every barge/truck on a trip-by-trip basis. 2.5.2 The BAT clearance will reference the following: i. Permit Reference. ii. Name of Operator (Barging Permit Owner). iii. Date of expected loading. iv. Name of Vessel/Barge/Truck. v. Load point (take off point). vi. Discharge port (destination). vii. Crude Quantity to be loaded. 2.5.3 Vessel/Barges/Trucks will have trackers installed to allow real-time monitoring of each trip by relevant parties in line with the Barging Permit approval conditions. 2.5.4 Certificate of Quantity (COQ) must be issued and endorsed by NMDPRA representatives, licensed/certified independent cargo Surveyor, and the BAT permit holder. 2.6 Security (each of these shall be properly documented in the OSCP) 2.6.1 Each BAT Operation will comply with the Security Management plan for the locations and transportation of crude. 2.6.2 Each BAT Operation will have an accountable Security Focal Point that will attend the periodic Security interface coordination meetings with the NMDPRA and relevant Security agencies.
GuidelinesPDF20234